2/17/2024 0 Comments Emc test labSince the system operator is responsible for the fixed system, he often also requires the system builder to provide corresponding evidence before commissioning.Accordingly, an on-site test is usually carried out during operation of the plant due to the presence of radio interference (emission) or due to functional interference (immunity).In the case of fixed installations, the interference immunity part of the test is an essential quality criterion for the proper functioning of the installation (e.g. ![]() The authorities limit their inspections to the interference emission part and usually only take action in the event of complaints (interference with (broadcast) radio reception).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |